• March 2014
The installation works of the RealtSO system go on successfully. The first interventions in the port of Thessaloniki have begun. These include the network’s installation and setup and the adjustment of a sea level sensor inside the sewer system (click here for photos).

• February 2014
The installation works of the RealtSO system have begun at the coast of Thessaloniki. Initially, the communication network will be put into operation and evaluated for its credibility and stability. Thereafter, the real time controlled outlet gates will be fitted in specific points of the combined sewer system of the city (see map )
.

• December 2012
The kick-off meeting of the project was held at the coast of the city of Thessaloniki, where the research team of Real-t-SO visited parts of the Sewerage System of the city.